5 - 12
5. BUS CONNECTION
5.2 System Configuration
5.2.3 Connection to QnASCPU or AnSCPU
When one GOT is connected
Main base unit
Bus extension
connector box
GOT
Extension base
unit
Connection cable 1) Connection cable 2)
Extension cable
Communication driver
Bus(A/QnA)
PLC
Connection cable 2)
GOT
Max. distance
Extens
ion
base
Extension
cable
*1
Main
base
Connection cable 1)
Bus
connector
conversion
box
*2
Option device
*4
Model
--
Main
base
--
GT15-A1SC07B(0.7m)
GT15-A1SC12B(1.2m)
GT15-A1SC30B(3m)
GT15-A1SC50B(5m)
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
GT15-ABUS2
Between main base and
GOT: 5m
- (Built into GOT)
--
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
GT15-C300EXSS-1(30m)
*3
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
GT15-ABUS2
Between main base and
GOT: 30m
- (Built into GOT)
GT15-A1SC05NB(0.45m)
GT15-A1SC07NB(0.7m)
GT15-A1SC30NB(3m)
GT15-A1SC50NB(5m)
A7GT
-CNB
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
GT15-C300EXSS-1(30m)
*3
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
GT15-ABUS2
Between main base and
GOT: 35m
(Including between main
base and bus connector
conversion box)
Between main base and
bus connector conversion
box: 5m
- (Built into GOT)