EMC 69001166 Portable Media Storage User Manual


 
1-24
EMC Installation Roadmap for CX-Series and FC-Series Storage Systems
AIX Installation Checklists
7 Server
Set HBA driver
parameters
Make sure the HBA driver parameters are set to the values required for
CLARiiON and PowerPath.
CAUTION Using improper settings can cause erratic failover behavior,
such as greatly increased I/O delays.
Host connectivity guide
8 Server
Install PowerPath
Insert the PowerPath installation CD and mount it. PowerPath Release
Notes and PowerPath
for UNIX installation and
administrator’s guide
Install PowerPath from the command line or using SMIT.
Register PowerPath.
Install any PowerPath patches from the Software downloads page on the
EMC Powerlink website:
http://powerlink.emc.com
9 Storage System
Install
Install the storage system in the cabinet, if not already installed. Rails and cabinet
documentation
10 Storage System
Initialize and
install software
enablers
Install the Navisphere Initialization Utility on a
non-AIX
host on the
same
subnet
as the storage-system management ports.
Storage-system setup
guide
Use the Navisphere Initialization Utility to initialize the storage system.
If you have SAN Copy, SnapView, and/or MirrorView software, install their
enablers.
Navisphere Manager
administrator’s guide
and online help
11 Storage System
Cable to switch
or server and
LAN
Connect the storage system to the switch or HBA ports. Storage-system setup
guide.
Checkpoint - For a SAN, verify the storage-system connections to the
switch by checking the LED(s) for the switch port connected to each SP
port.
For a 1-Gbit switch - LED is green, which indicates that the SP is logged
in to the switch port.
Switch documentation
For a 2-Gbit switch - One of the following:
The left LED is green and the right LED is off, which indicates that a
1-Gbit SP port is logged in to the switch port.
For a DS-xxB2 switch, both LEDs are green, which indicates that a
2-Gbit HBA port is logged in to the switch port.
For a DS-xxM2 switch, the left LED is blue and the right LED is off,
which indicates that a 2-Gbit HBA port is logged in to the switch port.
Cable each SP to the LAN connected to the hosts from which you will
manage the storage system.
Storage-system setup
guide.
Task
With Access Logix Reference Document