EMC 69001166 Portable Media Storage User Manual


 
PowerPath Checklist — New Windows Server and Existing Storage System Without Boot Disk
7-23
Windows Installation Checklists
19 Server
Make LUNs
available to
Windows
Prepare any new LUNs to receive
data by creating partitions on
them.
Prepare any new LUNs to receive
data by creating partitions on
them.
Host connectivity guide
or Windows
documentation
20 Windows Server
2003 Server
Install optional
CLARiiON VSS
provider
If you want applications to access
SnapView functionality on the
storage system using the VSS
framework or other APIs, Install
the optional CLARiiON VSS
provider on the server.
Note that Navisphere CLI must
be installed on the server.
N/A CX-Series Server
Software for Windows
Installation Guide
21 Server
Test PowerPath
with a license
key
If you have a PowerPath license key
If your PowerPath license key is not
registered, the load balancing policy is
restricted to basic failover.
View the LUNs available to the
server using the following
PowerPath command:
powermt display dev=all
class=clariion
If you have a PowerPath license key
If your PowerPath license key is not
registered, the load balancing policy is
restricted to basic failover.
View the LUNs available to the
server using the following
PowerPath command:
powermt display dev=all
class=clariion
PowerPath product
guide
Choose one available LUN to
receive I/O for the test.
Choose one available LUN to
receive I/O for the test.
View the paths to the chosen
LUN using the following
PowerPath command:
powermt display dev=
x
every=2
where
x
is a pseudo device that
represents the chosen LUN.
View the paths to the chosen
LUN using the following
PowerPath command:
powermt display dev=
x
every=2
where
x
is a pseudo device that
represents the chosen LUN.
Start I/O to the LUN.
Start I/O to the LUN.
Identify the HBA or NIC sending
I/O to LUN by viewing the output
of the powermt display dev=
x
every=2 command, and
disconnect the cable to that HBA
or NIC.
Identify the HBA sending I/O to
LUN by viewing the output of the
powermt display dev=
x
every=2
command, and disconnect the
cable to that HBA.
Task
With Access Logix Without Access Logix Reference Document