EMC 69001166 Portable Media Storage User Manual


 
5-30
EMC Installation Roadmap for CX-Series and FC-Series Storage Systems
Solaris Installation Checklists
18 Server
Test PowerPath
with a license key
If you have a PowerPath license key
Note If your PowerPath license key is not registered, the load balancing policy is
restricted to basic failover.
PowerPath product
guide
View the LUNs available to the server using the following PowerPath
command:
powermt display dev=all class=clariion
Choose one available LUN to receive I/O for the test.
View the paths to the chosen LUN using the following PowerPath
command:
powermt display dev=
x
every=2
where
x
is a pseudo device that represents the chosen LUN.
Start I/O to the LUN.
Identify the HBA sending I/O to LUN by viewing the output of the powermt
display dev=
x
every=2 command, and disconnect the cable to that HBA.
View the output of the powermt display dev=
x
every=2 command, and
verify that
The state of the uncabled path(s) becomes “dead.”
I/O continues to the remaining path(s) to the LUN
,
indicating that the
path failover was successful, and PowerPath is working properly.
-
Reconnect the cable that you disconnected from the HBA.
If you did not follow the above steps exactly and caused any LUNs to
trespass, restore the LUNs to their original SP with the following
PowerPath command:
powermt restore
PowerPath product
guide
19 Server
Applications
online
Bring any applications that you shut down (such as clustering or
databases) back online, and configure for PowerPath if required.
PowerPath for Unix
installation and
administrator’s guide
Task
With Access Logix Reference Document