PowerPath Checklist — Existing NetWare Server and New Storage System
4-27
NetWare Installation Checklists
You are now ready to set up any optional software, such as SnapView
or MirrorView, on the storage system.
20 Server
Test PowerPath
with a license key
(cont.)
View the output of the powermt display dev=
x
every=2 command, and
verify that
The state of the uncabled path(s) becomes “dead.”
I/O continues to the remaining path(s) to the LUN
,
indicating that the
path failover was successful, and PowerPath is working properly.
Reconnect the cable that you disconnected from the HBA.
If you did not follow the above steps exactly and caused any LUNs to
trespass, restore the LUNs to their original SP with the following
PowerPath command:
powermt restore
PowerPath product
guide
Task
With Access Logix Reference Document