PowerPath Checklist — Existing NetWare Server and New Storage System
4-27
NetWare Installation Checklists
You are now ready to set up any optional software, such as SnapView
or MirrorView, on the storage system.
20 Server
Test PowerPath
with a license key
(cont.)
❑
View the output of the powermt display dev=
x
every=2 command, and
verify that
• The state of the uncabled path(s) becomes “dead.”
• I/O continues to the remaining path(s) to the LUN
,
indicating that the
path failover was successful, and PowerPath is working properly.
❑
Reconnect the cable that you disconnected from the HBA.
❑
If you did not follow the above steps exactly and caused any LUNs to
trespass, restore the LUNs to their original SP with the following
PowerPath command:
powermt restore
PowerPath product
guide
Task
With Access Logix Reference Document