EMC 69001166 Portable Media Storage User Manual


 
3-8
EMC Installation Roadmap for CX-Series and FC-Series Storage Systems
Linux Installation Checklist
5Switches
Install
For a SAN
Install switches, if not already installed.
Rails, cabinet, and
switch documentation
Connect a cable from each host HBA port to a switch port.
Checkpoint - Verify the HBA connection to the switch by checking the
LED(s) for the switch port connected to the HBA port.
For a 1-Gbit switch - LED is green, which indicates that the HBA is
logged in to the switch port.
For a 2-Gbit switch - One of the following:
The left LED is green and the right LED is off, which indicates that a
1-Gbit SP port is logged in to the switch port.
For a DS-xxB2 switch, both LEDs are green, which indicates that a
2-Gbit HBA port is logged in to the switch port.
For a DS-xxM2 switch, the left LED is blue and the right LED is off,
which indicates that a 2-Gbit HBA port is logged in to the switch port.
6Storage System
Install
Install the storage system in the cabinet, if not already installed. Rails and cabinet
documentation
7Storage System
Initialize and
install software
enablers
Install the Navisphere Initialization Utility on a host on the
same subnet
as
the storage-system management ports.
Storage-system setup
guide
Use the Navisphere Initialization Utility to initialize the storage system.
If you have SAN Copy, SnapView, MirrorView, and/or MirrorView/A
software, install their enablers.
Navisphere Manager
administrator’s guide
and online help
Task
With Access Logix Reference Document