EMC 69001166 Portable Media Storage User Manual


 
PowerPath Checklist — New Windows Server and New Storage System
7-13
Windows Installation Checklists
You are now ready to set up any optional software, such as SnapView
or MirrorView, on the storage system.
25 Server
Test PowerPath
with a license key
(cont.)
Identify the HBA or NIC sending I/O to LUN by viewing the output of the
powermt display dev=
x
every=2 command, and disconnect the cable to
that HBA or NIC.
View the output of the powermt display dev=
x
every=2 command, and
verify that
The state of the uncabled path(s) becomes “dead.”
I/O continues to the remaining path(s) to the LUN
,
indicating that the
path failover was successful, and PowerPath is working properly.
Reconnect the cable that you disconnected from the HBA or NIC.
If you did not follow the above steps exactly and caused any LUNs to
trespass, restore the LUNs to their original SP with the following PowerPath
command:
powermt restore
Task
With Access Logix Reference Document