9-140ASAI-PT
9
Level 1 Status Inquiry Test (#621)
This test determines the state of the transmission facility of a BRI port at the
Level 1 (L1) or physical layer. L1 can be in one of two possible states: Activated
or Deactivated.
The Activated state is the correct state for an ISDN-BRI port. In this state the
Level 1 interface can communicate with the BRI endpoint or ASAI adjunct
administered on this port. This test passes if the state of L1 is activated. This test
also passes if software has taken this port out of service.
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long UUCSSpp
command and review the results of the BRI Port Local LAN Looparound
Test to verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Follow the repair procedures for the PKT-CTRL.
2. Issue the test port long UUCSSpp command and review the results of
the BRI Port Local LAN Looparound Test to verify the repair.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. Issue the test port long UUCSSpp command and review the results of
the BRI Port Local LAN Looparound Test to verify the repair.
2012 ABORT Internal system error
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
FAIL The Looparound test has failed.
1. If the test fails repeatedly, attempt to reset the circuit pack if the other
ports on the board are not in use. Reset the circuit pack by issuing the
busyout board UUCSS and the reset board UUCSS commands.
2. If the test fails again, execute test pkt P on the management terminal. If
this fails, follow the failure procedures the in PKT-BUS section.
3. If the tests executed in Step 2 pass, the problem is local to the BRI
board. Replace the circuit pack.
PASS The BRI Port Local LAN Looparound test has passed.
Table 9-55. TEST #618 BRI Port Local LAN Looparound — Continued
Error
Code
Te s t
Result Description/Recommendation
Continued on next page