A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-967ISDN-TRK (DS1 ISDN Trunk)
9
Signaling Link State Check Test (#255)
The DS1 ISDN Trunk depends on the health of the appropriate TN464C/D UDS1
Interface circuit pack or TN767 DS1 interface circuit pack for proper operation. It
also depends on the ISDN-PRI D-channel (ISDN-LNK) trunk. This test checks the
status of those critical elements.
Table 9-371. TEST #36 Audit and Update Test
Error
Code
Te s t
Result Description/ Recommendation
1018 ABORT Maintenance is disabled on this trunk.
1. Enable maintenance by entering ‘‘y’’ in the ‘‘Maintenance Tests?’’ field on
page 2 of the change trunk-group form.
ABORT Internal system error
2000 ABORT Response to the test request was not received within the allowable time period.
2100 ABORT Could not allocate the necessary system resources to run this test.
FAIL Test failed due to internal system error.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
PASS Trunk translation has been updated successfully. The current trunk states kept
in the DS1 interface circuit pack and switch software are consistent.
Continued on next page
Table 9-372. TEST #255 Signaling Link State Check Test
Error
Code
Te s t
Result Description/ Recommendation
None ABORT Internal system error
0 ABORT
1114 ABORT The signaling link is in a transitional state.
1. Retry the command at 1-minute intervals for a maximum of 5 times.
1018 ABORT Maintenance is disable on this trunk.
1. Enable maintenance by entering ‘‘y’’ in the ‘‘Maintenance Tests?’’ field on
page 2 of the change trunk-group form.
Continued on next page