![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/2/07/207ea955-b0a5-4690-afdf-8b9461a5122e/207ea955-b0a5-4690-afdf-8b9461a5122e-bg296.png)
DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Commands
8-351test maintenance
8
The following display shows a typical result when
test link 1 long
is entered.
test maintenance
test maintenance [C] [short | long] [repeat # | clear] [schedule]
The test maintenance command performs hardware diagnostic tests on a the
SYSAM (PPN) and EPN Maintenance circuit packs.
On the SYSAM, this command tests system maintenance, ACTIVE and STANDBY
terminal ports, and the SYSAM refresh, dual port RAM, system reset and sanity
timer functions. On the SYSAM, the long test sequence resets the circuit pack,
terminating any local or remote SYSAM logins. To see if the last 2 tests pass, you
must log in again. The Outpulse Relay Test and the Analog Loop Around Test are
not run on the standby SYSAM in a duplicated SPE.
On EPN Maintenance circuit packs, the MT interface, EI link, reset and sanity
functions are tested. The long test resets the EPN Maintenance circuit pack,
causing a local EPN Maintenance login to drop.
The cabinet number defaults to 1. Carrier
a
or
b
must be specified only for PPN
cabinets with duplicated SPEs.
Output
The following display shows a typical result when test maintenance a is entered.
test link 1 long SPE B
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01C2001 PGATE-PT 5464 610 ABORT 1000
01C2001 PGATE-PT 5464 611 ABORT 1000
01C2001 PGATE-PT 5464 599 ABORT 1005
01C2001 PGATE-PT 5464 613 PASS
01C2001 PGATE-PT 5464 614 ABORT 1
01C2001 PGATE-PT 5464 976 FAIL 2
01C2001 PGATE-PT 5464 977 FAIL
Command Successfully Completed