A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-1208PGATE-BD (Packet Gateway Circuit Pack)
9
Link Status Test (#601)
This test determines the state of the call control signaling link for X.25 Packet
Gateways.
This test determines if the signaling link is connected or disconnected. If the link
is connected, this test causes a test frame (called an XID frame) to be sent to the
Packet Gateway circuit pack over the signaling link. The test passes if the
signaling is connected and a test frame response is received by the switch. The
test fails if the signaling link is disconnected or no response if received from the
circuit pack.
This test is non-destructive.
PASS Hardware setting and attached cable type match Packet Gateway circuit pack
administration.
Table 9-484. TEST #601 Link Status Test
Error
Code
Tes t
Result Description/ Recommendation
2012 ABORT Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2100 ABORT The necessary system resources to execute the test could not be allocated.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2 FAIL The X.25 call control signaling link is disconnected.
1. Reexecute the test 5 times at 1-minute intervals.
2. If the test continues to fail, execute the ‘‘Packet Interface Test’’ to
determine if the problem is due to the circuit pack. If the test fails, see
repair procedures for Packet Interface Test.
3. If the Packet Interface Test passes, then see repair procedures for Packet
Control circuit pack and Packet Bus.
Continued on next page
Table 9-483. TEST #600 Congestion Query Test — Continued
Error
Code
Tes t
Result Description/ Recommendation
Continued on next page