A SERVICE OF

logo

DEFINITY Enterprise Communications Server Release 7
Maintenance for R7r
555-230-126
Issue 4
June 1999
Maintenance Object Repair Procedures
9-41ALARM-PT (ALARM PORT)
9
b. Indicates that the circuit pack has been removed or has been insane for
more than 11-minutes. To clear the error, reseat or replace the circuit
pack.
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the
Battery Feed Test
, for example, you may also
clear errors generated from other tests in the testing sequence.
Battery Feed Test (also called Port Diagnostic
Test) (#35)
The battery feed chip provides power to the telephone equipment, signaling,
rotary dial pulsing, transmission, and balance. This test checks the signaling and
switchhook capabilities of the battery feed chip by terminating the port, applying
battery, and trying to detect a current.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
Battery Feed Test (#35) X X ND
Station Status and Translation Audits and Updates
Test (#36)
XXND