IBM SAN384B Portable Media Storage User Manual


 
Installing a cable management finger assembly 63
Removing and installing port and application blades 64
Time and items required .........64
Removing a blade ...........64
Installing a blade ...........66
Removing and installing blade filler panels....67
Removing a filler panel .........67
Installing a filler panel..........67
Removing and installing a CP8 control processor
blade ................68
Time and items required .........68
Verifying the need for replacement .....68
Recording critical SAN384B information ....69
Removing a control processor blade (CP8) . . . 69
Installing a control processor blade (CP8) . . . 70
Verifying operation of the new CP blade....71
Downloading firmware from an FTP server. . . 71
Downloading firmware from a USB drive . . . 72
Removing and installing a CR4S-8 core switch blade 72
Time and items required .........73
Verifying the necessity of installation .....73
Removing a CR4S-8 core switch blade ....73
Installing a CR4S-8 core switch blade.....74
Removing and installing a power supply ....75
Time and items required .........75
Removing a power supply ........75
Installing a power supply ........76
Removing and installing a blower assembly . . . 77
Time and items required .........77
Removing a blower assembly .......77
Installing a blower assembly........78
Removing and installing a WWN bezel and WWN
card.................78
Time and items required .........78
Verifying necessity of installation ......79
Determining the status of a WWN card ....79
Removing the WWN bezel and WWN card. . . 79
Installing the WWN bezel and WWN card . . . 80
Removing and installing transceivers ......81
Time required ............81
Items required ............81
Removing and replacing an SFP, SFP+, or XFP
optical transceiver ...........82
Removing and replacing an mSFP optical
transceiver..............83
Removing and installing inter-chassis link (ICL)
cables ................84
Time and items required .........85
Removing an ICL cable .........85
Installing an ICL cable..........85
Removing and replacing a SAN384B chassis . . . 91
Time required ............92
Items required ............92
Verifying need for replacement .......92
Recording critical SAN384B and SAN
information .............92
Disconnecting from the network and fabric. . . 96
Removing components from the chassis ....97
Removing a SAN384B from the cabinet ....98
Installing the replacement chassis ......99
Installing components into the new chassis . . . 99
Downloading the configuration ......100
Verifying correct operation of system ....100
Reconnecting the system to the network and
fabric ...............102
Verifying correct configuration of the fabric . . 102
Cable routing table template .......104
Removing the battery ..........105
Chapter 6. Installing new features . . 107
FC3816, FC3832, FC3848 - Installing a 8-Gb port
blade (16, 32, or 48 ports) .........107
Time required ............107
Items required ............107
Procedures .............108
FC3864 - Installing an 8-Gb 64-port port blade . . 109
Time required ............109
Items required ............109
Procedures .............109
FC3850 - Installing an FR4-18i routing blade . . . 111
Time required ............111
Items required ............111
Procedures .............111
FC3870 - Installing an FC10-6 10 Gb blade....112
Time required ............112
Items required ............112
Procedures .............113
FC3880 - Installing an FCOE10-24 blade ....114
Time required ............114
Items required ............114
Procedures .............114
FC3890 - Installing an FX8-24 extension blade . . 115
Time required ............115
Items required ............115
Procedures .............115
FC7870 - Installing an inter-chassis cable kit . . . 116
Time required ............116
Items required ............116
Procedures .............116
Appendix A. Product specifications 119
General specifications...........119
System architecture ...........119
System size and weights..........122
System blade and FRU weights ......122
Facility requirements ...........123
Environmental requirements ........123
Fibre channel port specifications .......124
Power specifications ...........124
Data transmission ranges .........125
FR4-18i routing blade port specifications ....125
Fibre Channel port specifications ......125
GbE port specifications .........126
Powercords..............126
Appendix B. Application blades . . . 127
FR4-18i blade .............127
FX8-24 blade .............127
FCOE10-24 blade ............129
vi SAN384B Installation, Service, and User Guide
||
||
|
||
|
||
||
||
||
||