![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/8/d4/8d487632-ef12-400b-9039-6d218c9c67a3/8d487632-ef12-400b-9039-6d218c9c67a3-bg15.png)
PAGE 21
FIREBALL-MP INSTALLATION & USER’S GUIDE - M22002-01A1
CHAPTER 2 - SETTING UP FIREBALL-MP
2
Since no two people are likely to
have the same exact audio or video
conguration, the steps involved in
putting the FireBall-MP system together
are not specic to any one piece of
audio or video equipment. Therefore, it
may be necessary for you to customize
one or more of the cables that are
included with this equipment. Please
see Appendix A for a cable pin-out
conguration guide.
Depending upon the intricacy of the
audio and video equipment and the
access to each component, installation
should take approximately 2-4 hours.
Unpack The Equipment
u Carefully unpack all of the FireBall-MP equipment from the shipping container.
v Next, compare it to the following list and make sure you have everything
available before you get started.
• FireBall-MP unit packed in plastic bag
• Escient 48 button remote control with 2 AA batteries
• Detachable A/C Power Cord - 6'
• S-Video cable (Y-C) - 5'
• Composite Video cable - 5'
• Dual RCA cable - 5'
• User/Installation Manual
• Open Me First Guide
• Thank You Card
• Ethernet cable - 10'