A SERVICE OF

logo

Send documentation comments to mdsfeedback-doc@cisco.com.
D-3
Cisco MDS 9216 Switch Hardware Installation Guide
78-16165-01
Appendix D Site Planning and Maintenance Records
Site Preparation Checklist
5 Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6EMI
3
evaluation:
Distance limitations for signaling
Site wiring
RFI
4
levels
1. Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2. UPS = uninterruptible power supply.
3. EMI = electromagnetic interference
4. RFI = radio frequency interference.
Table D-1 Site Planning Checklist (continued)
Task No. Planning Activity Verified By Time Date