Pelco DX9200HDDI Portable Media Storage User Manual


 
8 C637M-B (10/03)
INSTALLATION
Make sure the following parts are supplied with the storage unit.
1Video Storage Unit with IDE hard drives
2 Power cords (1 USA standard and 1 European standard)
2 External SCSI cables
2 Active terminators (for connecting to SCSI channels)
2 Brackets
6 Screws, M4 x .250-inch, pan head
4 Adjustable support rails
6 Screws, 8-32 x .375-inch, pan head with washers
12 Screws, 10-32 x .375-inch, flat head
4 Screws, 10-32 x .750-inch, Phillips, pan head with washers
CAUTION: The storage unit should be installed in an air-conditioned room where the temperature is maintained between 41°
and 85°F (5° and 29°C) with relative humidity not to exceed 85 percent, noncondensing.
The storage unit should be connected to an uninterruptible power supply (UPS) capable of supplying a minimum of 5 A for 120
VAC power systems or 2.6 A for 230 VAC power systems.