Chapter 2 2-29
Library Installation
Connecting and Powering on the Library (for Models 2/20, 4/40, and
6/60)
Library Installation
Library Installation
6. Add the appropriate terminators to the remaining SCSI connectors.
7. Connect the remote management card to the LAN (see “Configuring
the Remote Management Card” on page 4-10).
8. Connect a power cord to each power supply module on all levels.
9. Power on the library by pressing the power (standby) switch in the
bottom right corner.
After the power-up test completes (takes several minutes), you will
see the default Home Screen on the library’s front panel (see “Front
Panel Overview” on page 3-3).
10.Power on other peripherals and then the host.
Figure 2-20 Model 2/20 SCSI Cable Connections
1 Host (user configured)
2 SCSI cable with 68-pin connectors
3 Remote management card LAN connection
4 Jumper cable with SCSI 68-pin connectors
5 Appropriate 68-pin terminator