![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/b/c2/bc2d2126-64d3-49bf-b5ef-f2663d4b760b/bc2d2126-64d3-49bf-b5ef-f2663d4b760b-bg1f.png)
975-0082-01-01 21
Xanbus Automatic Generator Start Installation
Type 7
Type 7 will work with both two-wire and three-wire run mode configurations
that require a preheat signal before cranking. This Gen Type setting is suitable
for generators with an automatic engine cranking control system (two-wire)
and generators that require that the AGS control their starter separately (three-
wire).
Figure 13
Type 7 Connection Diagram (two-wire)
Figure 14
Type 7 Connection Diagram (three-wire)
AGS Harness Wires Generator Wires
16
14
13
12
Relay 1
5A fuse
GENERATOR RUN SIGNAL
GENERATOR RUN SIGNAL RETURN
RUN
For additional information, see “Circuit Limitations” on page 11.
AGS Harness Wires Generator Wires
GENERATORRUN SIGNAL
GENERATORRUN SIGNAL RETURN
RUN
18
17
16
14
13
12
Relay1
Relay2
5A fuse
5A fuse
START
For additional information, see “Circuit Limitations” on page 11.
Relay Function Preset Configuration Setting
Relay 1 mode Run
Relay 3 mode No function
Gen Run signal hold time 0.5 s
Preheat time 20 s
Preheat to crank delay 1 s
Crank time 15 s
Crank retry time 30 s
Gen Cool Down 30 s
Gen Spin Down 3 s
Shutdown bypass time 0 s
Start tries 3