A SERVICE OF

logo

2-32
Cisco IE 3000 Switch Hardware Installation Guide
OL-13017-01
Chapter 2 Switch Installation
Connecting Power and Alarm Circuits
Figure 2-27 Removing the Switch from the DIN Rail
Step 4 Remove the switch from the DIN rail.
Connecting Power and Alarm Circuits
After the switch is installed, you are ready to connect the DC power and alarm relays.
Wiring the Protective Ground and DC Power, page 2-32
Wiring the External Alarms, page 2-33
Wiring the Protective Ground and DC Power
For instructions on grounding the switch and connecting the DC power, see the “Connecting the
Protective Ground and DC Power” section on page 2-13.
For instructions on using a power converter for DC power, see the “Connecting the Switch to the Power
Converter” section on page 2-44.
201850