A SERVICE OF

logo

Index
IN-5
Cisco IE 3000 Switch Hardware Installation Guide
OL-13017-01
removing the switch from a DIN rail or a rack 2-31 to 2-32,
B-35 to B-36
removing the switch from parallel and face-down mounted
positions
2-31 to 2-32, B-35 to B-36
RJ-45 connector, console port C-4
S
safety warnings 2-2 to 2-4, B-2 to B-4
SC connector C-3
serial number location 3-6
SFP modules
bale-clasp latch removal
2-40, B-44
cables C-4
connecting to 2-41 to 2-42, B-45 to B-46
connectors C-3
described 1-5
installation 2-38 to 2-40, B-43 to B-44
Simple Network Management Protocol
See SNMP
SNMP
1-15
software switch management 1-14 to 1-15
specifications A-1 to A-2
speed, troubleshooting 3-4
straight-through cable
pinout
four twisted-pair 1000BASE-T ports
C-6
two twisted-pair 10/100 ports C-5
straight-through cable pinout
four twisted-pair 1000BASE-T ports
C-7
SunNet Manager 1-15
supply wires warning 2-51, B-3, B-57
switch, power-on 2-22, B-25
switch models 1-2
system LED 1-9
T
technical specifications A-1 to A-2
Telnet, and accessing the CLI 1-14
temperature, operating A-3
terminal, connecting to a switch 2-12 to 2-13, B-15 to B-16
terminal-emulation software 2-12, B-15
troubleshooting
bad or damaged cable
3-2
connection problems 3-2
diagnosing problems 3-1
Ethernet and fiber cables 3-2
link status 3-3
ping end device 3-3
port and interface settings 3-3
POST 3-1
serial number location 3-6
spanning tree loops 3-4
speed, duplex, and autonegotiation 3-4
switch performance 3-4
understanding POST results 3-1
with LEDs 3-2
troubleshooting spanning tree loops 3-4
V
verifying package contents 2-5, B-7
verifying switch operation 2-11 to 2-22, B-14 to B-25
W
warnings
airflow restriction
2-3
ambient temperature 2-3
DC power 2-2
functional ground lug 2-14, B-17
industrial environment B-4
installation 2-2 to 2-4, B-2 to B-4
jewelry removal 2-2, B-2