A SERVICE OF

logo

Index
IN-3
Cisco IE 3000 Switch Hardware Installation Guide
OL-13017-01
hazardous location (continued)
grounding the switch B-17
installation guidelines B-5
installing compact flash memory card B-5
installing the switch B-26
running POST B-25
hazardous location warnings
ambient temperature
B-3
console cable B-3
DC power B-3
disconnecting the console cable B-3
disconnecting the power and relay connector B-3
disconnecting the wiring B-4
nonhazardous area for installation B-4
power and relay connector B-3, B-24
substitution of components B-4
HP OpenView 1-15
humidity A-2
I
IE-3000-4TC switch, illustrated 1-3
IE-3000-8TC switch, illustrated 1-3
IEM-3000-8FM module, illustrated 1-4
IEM-3000-8TM module, illustrated 1-4
industrial environment warning B-4
installation
assigning the IP address
D-2
attach the power and relay connector 2-21, B-24
compact flash memory card B-13
DIN rail 2-24, B-27
grounding procedures 2-13 to 2-15, B-17 to B-19
guidelines 2-3, B-5
hazardous location B-1
package contents 2-5, B-7
POST 2-22, B-25
pre-installation information and guidelines 2-1 to 2-4,
B-1 to B-7
rack-mount 2-29 to 2-31, B-33 to B-35
installation (continued)
required clearance 2-4, B-7
SFP modules 2-38 to 2-40, B-43 to B-44
starting the terminal emulation software D-1
verifying switch operation 2-11 to 2-22, B-14 to B-25
wall 2-27, B-27
wiring the relays 2-33 to 2-35, B-38 to B-40
J
jewelry removal warning 2-2, B-2
L
LEDs
100BASE-FX ports
1-10
alarm 1-9
dual-purpose port 1-11
front panel 1-6 to 1-11
port status 1-10
POST results 3-1
power status 1-9
setup 1-8
system 1-9
troubleshooting with 3-2
lightning activity warning 2-2, B-2
link status troubleshooting 3-3
M
management options 1-14 to 1-15
module
configurations
2-6, B-9
connecting 2-8, B-11
mounting
rack
2-29 to 2-31, B-33 to B-35
MT-RJ connector C-3
See also 100BASE-FX ports