Sonic Alert 705 Clock Radio User Manual


 
March 2001 Page 63
AOC-14 ETOPS - Extended Range Operations
7.
Do part pooling activities consider
ETOPS CMP requirements?
Ref: TP 6327 4.11
N/A OK Finding Not Checked
8.
Does the aircraft configuration and
modification status conform to the
requirements specified in the CMP
document? (sample, component
changes)
Ref:
N/A OK Finding Not Checked
9.
Is there any evidence to suggest
that the operator has conducted a
verification process after engine
shutdown or primary system
failure or critical maintenance
activities? (sample)
Ref: TP 6327 4.6
N/A OK Finding Not Checked
10.
Does the operator continue to
input unscheduled / scheduled
engine removal data into the
ETOPS program?
Ref: TP 6327 4.9.2
N/A OK Finding Not Checked
11.
Are thrust reductions due to
abnormal causes logged and
tracked for program input?
Ref:
N/A OK Finding Not Checked
12.
Does the operator adhere to the
approved reliability program and
are ETOPS sensitive items
covered by the program, i.e.
propulsion, systems, structure?
Ref:
N/A OK Finding Not Checked