Sonic Alert 705 Clock Radio User Manual


 
March 2001 Page 52
AOC-11 Maintenance Planning
specified in the manual?
Does this information include
a requirement for - defects,
MELs, special
inspections,hard landings,
lighting strikes, etc
Ref: CASS 726.08(1)(m)
12.
*For aircraft operating under MEL
authorities, how is repair interval
planned and actioned?
Ref: CASS 726.08(1)(m)
N/A OK Finding Not Checked
13.
Is the liaison between the operator
and the maintenance contractor
effective?
Is there any evidence that the
communication process does
not work?
Ref: CAR 706.09(2)(a) / CASS
726.04(1)(g)
N/A OK Finding Not Checked
14.
*Is the maintenance contractor
consulted in the defect deferral
process?
Ref: CASS 726.04(1)(g) / CASS
726.08(1)(v)
N/A OK Finding Not Checked
15.
Are maintenance requirements
communicated to the AMO in
accordance with manual
requirements?
Ref: CASS 726.04(1)(g) / CASS
726.08(1)(v)
N/A OK Finding Not Checked
16.
Does the operator maintain current
inspection sheets as identified in
the Maintenance Schedule?
Ref: CAR 605.86 / Approved
Maintenance Schedule (TP13094)
N/A OK Finding Not Checked
17.
Do inspection sheets cover all
applicable areas of the aircraft as
N/A OK Finding Not Checked