March 2001 Page 40
AOC-09 Reliability Monitoring Programs
13.
If sampling techniques are to be
used, is the method of sampling -
number of / in service time /
intervals, specified?
N/A OK Finding Not Checked
Establishing Performance Standards and Revision:
14.
Does the program include an initial
performance standard that defines
acceptable performance
requirements?
N/A OK Finding Not Checked
15.
Does the manual describe
methods used to evaluate and
control performance? Are various
methods in use?
N/A OK Finding Not Checked
16.
Are performance standards for
system or component failures
expressed in mathematical
terms ? For example:
• 1000 hours of aircraft
operation ?
• Number of landings ?
• Operating cycles ?
• Departure delays ?
• Pilot reports ?
• Other findings under
operational conditions ?
N/A OK Finding Not Checked
17.
When a performance standard is
exceeded, is an active
investigation required ?
N/A OK Finding Not Checked