A SERVICE OF

logo

Reelmaster 5010 SeriesHydraulic System (Rev. C) Page 4 -- 50
Gear Pump (P4) Flow Test
(Using Tester with Pressure Gauges and Flow Meter)
Figure 46
T
C4
P4
C5
C1
C2/3C2/3L
LEFT
FRONT
RIGHT
FRONT
FRONT
CENTER
REAR
R8
C4L
C5L
C1L
REAR
LEFT
RIGHT
100MESH
SUCTION
STRAINER
INTERNAL
CASE
DRAIN
P1
P2
P3 P4
G4
SV3
SV1
SV2
R7
SVRV
CV4
CV1
CV5
CV23
PUMP(P5)
TOSTEERING
TOMOWCONTROL
(REARCUTTING UNITS)
(FRONTCUTTING UNITS)
TOMOWCONTROL
FROMMOW CONTROL
MANIFOLD
CONTROLVALVE
TESTER
(NOTENERGIZED)
LIFT
CONTROL
MANIFOLD
The gear pump (P4) flow test should be performed to
make sure that the cutting unit lift circuit has adequate
hydraulic flow.
Procedure for Gear Pump (P4) Flow
Test
1. Make sure hydraulic oil is at normal operating tem-
perature by operating the machine under load for
approximately ten (10) minutes.
2. Parkmachine ona levelsurfacewiththecuttingunits
loweredandPTOswitchoff.Makesureengineisoff.Ap-
ply the parking brake.
3. Read Precautions For Hydraulic Testing in this sec-
tion.
CAUTION
Before openinghydraulic system, operateall hy-
draulic controls to relieve system pressure and
avoid injury from pressurized hydraulic oil. See
Relieving HydraulicSystemPressure inthe Gen-
eral Information section of this chapter.