Chapter 2 Site Planning
Site Planning Checklist
2-8
Cisco Catalyst 4900M Switch Installation Guide
78-18350-01
Ta b l e 2-1 Site Planning Checklist
Task No. Planning Activity Verified By Time Date
1 Space evaluation:
Space and layout
Floor covering
Shock and vibration
Lighting
Maintenance access
2 Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
3 Power evaluation:
Input power type
Receptacle proximity to the equipment
Dedicated (separate) circuits for redundant power
supplies
UPS for power failures
4 Grounding evaluation:
Circuit breaker size
5 Cable and interface equipment evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6 EMI evaluation:
Distance limitations for signaling
Site wiring
RFI levels