March 2001 Page 33
AOC-08 Maintenance Development Program (MPD)
25.
If sampling is used, the method,
number of samples, time on the
samples, when sampling and
intervals spelled out.
N/A OK Finding Not Checked
26.
Does the operator define tasks
such as “inspection”, “check” for
their scope of purpose?
N/A OK Finding Not Checked
27.
Escalation procedure - required
series or sequence of checks?
N/A OK Finding Not Checked
28.
Are task interval parameters
tailored to operators desired units?
N/A OK Finding Not Checked
29.
Does the operator participate in
the MRB process?
• If so is their utilization
comparable to that of the
world fleet leaders?
N/A OK Finding Not Checked
30.
Are alternate or substitute
inspection methods used to qualify
maintenance requirements, i.e. X-
ray substituted for ultrasonic?
N/A OK Finding Not Checked