Sonic Alert 704 Clock Radio User Manual


 
March 2001 Page 101
AOC-26 Control of Parts, Parts Pooling
requirement for the acquisition of
parts and materials used during
the performance of elementary
work and servicing?
Ref: Std. 706.08(1)(r)
7.
Are shelf-lifed items controlled as
described in the MPM/MCM?
Ref:
N/A OK Finding Not Checked
8.
Are flammable fluids and materials
stored in fireproof cabinets in a
separate area?
Ref:
N/A OK Finding Not Checked
9.
Are material batches numbered as
described in the MPM/MCM?
Ref:
N/A OK Finding Not Checked
10.
Are scrap items mutilated as
described in the MPM/MCM?
Ref:
N/A OK Finding Not Checked
11.
Does the acquisition procedure
involve parts pooling agreements
with other operators?
If parts pooling is used, are
limits on their use, and
certification requirements
specified in the manual /
contract?
Is traceability back to the
N/A OK Finding Not Checked