CONNECTIONS AND POWER-ON SEQUENCE
2-7
2.4 POWER-ON SEQUENCE
After making all the connections, turn on the power in the sequence: host computer, main unit and target (user
target system).
J Power-on sequence
After making all the connections, turn on the power in the sequence: host computer, main unit and target (user
target system). Set the power switch on the rear of the main unit to 1. The LAN adapter is switched on at the
same time as the main unit.