— 3 —
Installation, Operation and Care of
MODEL MEF24A ELECTRIC FRYER
PLEASE KEEP THIS MANUAL FOR FUTURE USE
GENERAL
Vulcan fryers are produced with quality workmanship and material. Proper installation, usage and
maintenance of your fryer will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions
provided.
INSTALLATION
Before installing, verify that the electrical service agrees with the specifications on the rating plate
located on the inside of the front panel. If the supply and equipment requirements do not agree, do
not proceed with the installation. Contact your dealer or Vulcan-Hart Company immediately.
UNPACKING
This fryer was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the fryer is found to be damaged, save the packaging material and
contact the carrier within 15 days of delivery.
Carefully unpack fryer and place in a work-accessible area as near to its final installed position as
possible. Remove the packing bag containing the adjustable legs from inside the carton.
LOCATION
The installation location must allow adequate clearances for servicing and proper operation. A
minimum front clearance of 36" is required.
INSTALLATION CODES AND STANDARDS
The fryer must be installed in accordance with state and local codes and with the National Electrical
Code, ANSI/NFPA-70 (latest edition). Copies may be obtained from The National Fire Protection
Association, Batterymarch Park, Quincy, MA 02269.
ASSEMBLY
Screw the legs into the permanently fastened nuts on four corners of the fryer bottom. Tighten the legs
and set the fryer in place. CAUTION: Do not slide fryer with legs mounted. If it is necessary to
move the fryer, allow it to cool, then lift it.