A SERVICE OF

logo

33
3. Leaving enough wire for the LEAD IN, insert the
specified number of turns of wire in the cut grooves.
(See chart).
CAUTION: Be careful not to damage the wire
insulation during installation.
4. After completing the required number of loop turns,
twist the ends together at the rate of 6 turns per foot to
form the LEAD-IN.
5. Seal the LEAD-IN wire in the conduit to prevent
moisture seepage into the conduit.
6. Fill over the loop wires in the groove with a
recommended loop sealant. Contact your distributor
for available sealants.
7. Mount the loop detector in the operator and connect
the wire loop.
8. Connect loop detector to the control board as shown
on the following page.
34
V
OR
R
P
Not Used
BL
BK
WH
Y
GR
BR
GY
TO
DRIVEWAY
LOOP
SHADOW LOOP CONNECTION
NOTE: TWIST LEADS APPOX.
6 TURNS PER FOOT.
7
8
9
AB
Red Wire From
Aux. Open Limit
10
V
OR
R
P
Not Used
BLBK WH Y
GR
BR
GY
TO DRIVEWAY
LOOP
NOTE: TWIST LEADS APPOX.
6 TURNS PER FOOT.
EXIT LOOP CONNECTION
2
3
4
5
AB
V
OR
R
P
Not Used
BL
BK
WH
Y
GR
BR
GY
TO
DRIVEWAY
LOOP
REVERSING LOOP CONNECTION
NOTE: TWIST LEADS APPOX.
6 TURNS PER FOOT.
7
8
9
10
AB