![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/4/e8/4e89e3bf-cbf9-4f9d-ba9f-ddcabe06a18d/4e89e3bf-cbf9-4f9d-ba9f-ddcabe06a18d-bg2c.png)
2-6
Catalyst 3750 Switch Hardware Installation Guide
OL-6336-07
Chapter 2 Switch Installation
Preparing for Installation
Verifying Package Contents
Note Carefully remove the contents from the shipping container, and check each item for damage. If any item
is missing or damaged, contact your Cisco representative or reseller for support. Return all packing
material to the shipping container, and save it.
The switch is shipped with these items:
• The Catalyst 3750 Switch Getting Started Guide (Catalyst 3750-24TS, 3750G-24TS-1U,
3750G-24T, 3750G-24TS, 3750-48TS, 3750G-48TS, 3750-24PS, 3750G-24PS, 3750-48PS,
3750G-48PS and 3750G-16TD switches)
• The Catalyst 3750G Integrated Wireless LAN Controller Switch Getting Started Guide
(3750G-24WS-S25 and 3750G-24WS-S50 switches)
• The Regulatory Compliance and Safety Information for the Catalyst 3750 Switch
• AC power cord (AC-powered switches)
• DC terminal block plug (DC-powered switches)
• One RJ-45-to-DB-9 adapter cable
• Mounting kit containing:
–
Four rubber feet for mounting the switch on a table
–
Two 19-inch rack-mounting brackets
–
Four Phillips flat-head screws for attaching the brackets to the switch (Catalyst 3750G-24TS
switch)
–
Six Phillips flat-head screws for attaching the brackets to the switch (Catalyst 3750-24TS,
3750G-24TS-1U, 3750G-24T, 3750-48TS, 3750G-48TS, 3750-24PS, 3750G-12S,
3750G-12S-SD, 3750G-24PS, 3750-48PS, 3750G-48PS, 3750G-16TD, 3750G-24WS-S25, and
3750G-24WS-S50 switches)
–
Four Phillips machine screws for attaching the brackets to a rack
–
One cable guide and one black Phillips machine screw for attaching the cable guide to one of
the mounting brackets
–
One RPS connector cover (for wall mounting)
–
Two Phillips pan-head screws (for attaching the RPS cover)
–
Four Phillips truss-head screws (for wall-mounting brackets)
–
StackWise cable: 0.5-meter, 1-meter, or 3-meter cable.
Note If you do not specify the length of the StackWise cable, the 0.5-meter cable is supplied.
Verifying Switch Operation
Before you install the switch in a rack, on a wall, or on a table or shelf, you should power on the switch
and verify that the switch passes POST. See the “Running Express Setup” section in the getting started
guide for the steps required to connect a PC to the switch and to run Express Setup.