![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/8/c3/8c3c628c-1d11-435c-af3b-0954d2bd5853/8c3c628c-1d11-435c-af3b-0954d2bd5853-bg21.png)
2-13
Cisco ME 3800X and ME 3600X Switch Hardware Installation Guide
OL-22168-01
Chapter 2 Switch Installation
Installing the Switch
After the switch is mounted in the rack, you need to do these tasks to complete the installation:
• Power on the switch. See the “Verifying Switch Operation” section on page 2-4.
• Connect to the console port, and run the initial configuration. See the Cisco ME 3800X and
ME 3600X Switch Getting Started Guide for instructions.
• Connect to the front-panel ports. See the “Connecting to the 10/100/1000 Ports” section on
page 2-19 and the “Connecting to Fiber-Optic SFP+ and SFP Modules” section on page 2-20.
For configuration instructions about using the CLI setup program, go to Appendix C, “Configuring the
Switch with the CLI-Based Setup Program.”
Wall-Mounting
• Attaching Brackets for Wall-Mounting, page 2-13
• Mounting the Switch on a Wall, page 2-14
Note Wall-mounting is not supported for NEBS applications.
Attaching Brackets for Wall-Mounting
Figure 2-8 Attaching 19-inch Bracket to Wall-Mount Cisco ME 3800X
Follow the same steps to attach the second bracket to the opposite side.
1 Phillips truss-head screws