A SERVICE OF

logo

Installation 2-3
Site Preparation
Figure 2-2 Floor Mounting Hole Pattern (IPX 16/32)
Required Tools and Equipment
The following tools and equipment are required to install the IPX:
Flat blade screwdriver set
Phillips screwdriver set
Grounding wrist strap
DVM (digital voltmeter)
Wrench (1") for raising and lowering cabinet feet
H8098
6.80"
(17.27cm)
8.40"
(21.37cm)
1.00"
(2.54cm)
24.45"
(62.10cm)
Cable entry
cutout
Cabinet rear
3/8" hole
7/8" access hole
(4 places)