
REV 91520-20120622 8
91520 ENGLISH
ASSEMBLY
Your log splitter is requires some assembly.
If you have any questions regarding the assembly of your
log splitter, call our help line at 1-877-338-0999. Please
have your serial number and model number available.
Open Shipping Crate
1. Set the shipping crate on a solid, flat surface
2. Carefully cut the shipping bands and remove lid of
shipping crate.
3. Locate all hardware before beginning assembly.
1) Attach Beam to Axle Assembly
1. Attach the splitting beam to the axle by inserting two
M12x80 bolts into the bolt holes on the bottom of the
axle and through the base plate on the bottom of the
hydraulic oil tank below the splitting beam. Secure
with two M12 lock nuts.
2. Insert two M12x75 bolts into the back of the axle and
through the base plate on the bottom of the hydraulic
oil tank. Secure with two M12 lock nuts.
2) Install Wheels
1. Slide the wheel onto the axle.
2. Place washer on axle and secure with cotter pin.
3. Repeat for wheel on other side.
3) Install the Tow Bar and Support Leg
1. Attach the tow bar to the bracket on the bottom of
the splitting beam opposite the axle. Secure with two
M12x80 bolts and M12 lock nuts.
2. Attach the support leg to the same bracket on the
bottom of the splitting beam. Secure with one M12x80
bolt and M12 lock nut.
3. Secure the support leg in the vertical position by
inserting the L-pin through the bracket and support leg
and securing with hair pin clip.
4) Install the Engine
1. Place the engine on the engine bracket with the pump
facing the cylinder.
2. Secure the engine with four M8x40 bolts, M8 washers,
M8 lock washers and M8 nuts. Tighten to 18 ft-lb.