![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/7/42/7429aa91-971a-4979-9c5d-35957894463d/7429aa91-971a-4979-9c5d-35957894463d-bg5.png)
BP-PR PLUS series
Installation
Edition 7/06 Quick Operator’s Guide 5
3 Installation
3.1 Unpacking the transfer printer
⇒ Lift the transfer printer out of the box via the straps.
⇒ Check transfer printer for damage which may have occurred during transport.
⇒ Check delivery for completeness.
Scope of delivery
3.2 Setting up the transfer printer
• Transfer printer
• Empty cardboard core, mounted on ribbon take-up hub
• Tear-off plate (basic devices only)
• Dispense plate (peel-off device ver-
sion only)
• Power cable
• Documentation
Retain the original packaging for subsequent transport.
CAUTION!
The device and the print media can be damaged by moisture and water.
⇒ The transfer printer may only be set up in a dry place protected from sprayed water.
Fig. 1: Removing the transportation safeguards
⇒ Set up printer on a level surface.
⇒ Open cover (1) of the transfer printer.
⇒ Remove foam transportation safeguards
near the printhead (2).
2
1