A SERVICE OF

logo

STEP-BY-STEP INSTALLATION GUIDE
11
Powering Up the Switch
1. Connect the included 9V DC, 1A power supply adapter into an
available power outlet.
2. Attach the barrel into the power jack on the Switch to power
the unit. The LEDs should illuminate.