Home And Office Set-Up
32
Base Station
Operation
(From 120V AC
House Current)
Base Station Operation
(From 120V AC House Current)
To operate your transceiver from home or office
you will need a 13.2 volt DC Power Pack rated at
a minimum of 2 amps, and a properly installed
base station antenna.
Warning!
Do not attempt to operate this
transceiver by connecting it
directly to 120V AC.
Note
For further information call
Cobra Customer Service
1.773.889.3087.
1
Simply connect the red (+) and black (-)
leads of the transceiver to the corresponding
terminals of the power pack.
+ —